About the project

Proposed five turbine development, located in North Ayrshire, Scotland

Project Overview

  • Location: Within North Ayrshire Council, approximately 3.8 km east of Largs and 3.2 km north west of Kilbirnie, north of the Muirhead and Camphill Reservoirs.
  • Number of Turbines: Up to 5 wind turbines.
  • Wind Turbine Tip Height: Up to 200 metres (m) to tip.
  • Installed Capacity: 30-40 megawatts (MW) depending on final turbine choice.
  • Lifespan of Wind Farm: Up to 40 years.

Location & Project Design

Our indicative proposed layout can be seen below, and downloaded here. It is cognisant of environmental constraints, and is currently being reviewed by consultees as part of the Scoping process.

Project Status

On Monday 6th July 2026, Eurowind Energy Limited submitted a Scoping Report to North Ayrshire Council for our proposed wind farm (report available to view via the link at the bottom of this page).

The Scoping stage seeks to engage the planning authority and other statutory and non-statutory stakeholders at an early stage in the planning process; ensuring that key issues, based on local understanding, are identified.

Receipt of scoping responses, and feedback from upcoming public consultation events, and continued environmental surveys, will help to inform the design of the proposed wind farm.

We expect to submit the planning application for Whitehill Wind Farm by mid-2027. 

Upcoming Public Consultation Round 1 - September 2026

As part of their early engagement, Eurowind Energy Limited will host two drop-in public exhibition events in September 2026. This first round of consultation gives local residents the opportunity to explore the proposals and speak directly with the project team. Feedback forms will be available to complete. The events are as follows:

  • 9th September 2026 - 2pm to 8pm in the Bridgend Community Centre, Kilbirnie, KA25 7DJ

  • 10th September 2026 - 2pm to 8pm at Blair Arms Inn, 2–4 Vennel Street, Dalry, KA24 4AF

This public consultation period will run from 7th September - 2nd October 2026, and the Exhibition materials will be available to download on this website from 7th September. Detailed project information is included within the Scoping Report, available to view in the 'Project Documents' section below.

Exhibition materials:

  • Exhibition Banners
  • Photomontages
  • Zone of Theoretical Visibility
  • Wirelines
  • Feedback Form
  • Community Letter
  • Newspaper Notices

If you were unable to attend, you can contact us by emailing whitehillwindfarm@eurowindenergy.com, or write to Eurowind Energy Ltd, 1st Floor, 120 West Regent Street, Glasgow, G2 2QD.

Benefits

Eurowind Energy Limited is fully committed to providing a community benefit fund of £5,000 per installed MW per annum.

We are keen to engage with local initiatives and communities to ensure local needs are met, as well as supporting new and existing community projects. Should consent be awarded, we would seek to implement a number of measures to ensure that local people, communities, and businesses are able to benefit from the project.

Project Documents

You can access the EIA Scoping Report and associated Figures via the links below:

EIA Scoping Report

EIA Scoping Figures

Contact & Further Information

The Project Team can be contacted directly by emailing: whitehillwindfarm@eurowindenergy.com.